Friday, March 31, 2017

March 2017

March was filled with quilting.

Early in the month I made St. Patrick's Day "cards" for my great-nieces and nephews.  Today I finished Easter cards as well.  I forgot to take a photo of the St. Pat's cards before I put them in the mail.  I've been having fun making something to send the kids.

I didn't create this design.  It's from Embroidery Library.
For the St. Pat's cards I scanned a shamrock and used
IQ Designer on my Destiny to create the design.
I actually finished a challenge quilt one month BEFORE it was due!  That is truly amazing for me.  I actually scrapped my first attempt and created a similar second version to use for the challenge.  That means I completed two table runners in about one week.  Of course, this was only possible because I was working ahead.


Two table runners.  The top one is my first attempt.
I cut the pieces with my Sissix, then just quilted, thinking I'd cut it down to size
afterward.  However, I liked the quilting and didn't want to cut it 
off, so I made the second one.  The challenge was black & white, with the
red fabric given to us.  There are actually three different blacks, but even in person
you can hardly tell.  I didn't want to make a 24 x 24 piece, so decided the table runner
could fit the size restriction and be something I would actually use.
I didn't want to cut off all the feathers.

I had to use a recognizable piece of the given red fabric. I made red piping.
The quilting is similar, but I marked the outside edge first then stayed
within the boundary.  



This is the quilt I gave my sister this month in honor of her award.  I
tried making a beaded fringe, but it wasn't adding to the quilt.  I cut
off the beads and left it plain.  Actually a good choice.
I started my block of the month for The Quilt Show.  (no photo - just because I didn't take one)  I had finished month two, but took it apart to correct a size error that would only grow as the quilt progressed.  I know in a couple of months I'll be glad I did.  So even though tomorrow is the end of March, I'm actually only one month behind.  Not bad for me!!

I have three quilts in Best of The Valley quilt show.  April 7 - 9, Lindsay CA.  Although I never expect to get a ribbon, it's always exciting to see if there is one on the quilt when I get there.

As I finish writing this it doesn't seem like a lot of projects, but it felt like I was at the machine a lot this month.  I'm still working on finishing projects and getting them out of the studio.  That's why I finished the challenge.  It's already delivered . . . . . out of the studio!

Thanks for checking in.

2 comments:

  1. I didn't realize until you put them side by side that the feather design was different in the second one. I like the way you laid them out. I think you got a lot done-especially knowing how long it took to work on the Quilt Show BOM. What days will you be at Lindsey. I'll be at the show all day Sunday.

    ReplyDelete
  2. Awesome! I love the tablerunners and the embroidery! Can't wait to see your BOM

    ReplyDelete

Thanks for sharing.